Apprentice Assembler-Installer for the MU2 Wind Project, responsible for tower erection, component h
岗位职责
The Apprentice Assembler-Installer will be responsible for the erection of wind turbine towers, handling of turbine components, and performing work at heights.
This role is part of the Mesgi'g Ugju's'n 2 (MU2) Wind Project located in the unorganized territory of Rivière‑Nouvelle, within the Avignon RCM.
Key responsibilities include assembling and installing turbine structures, ensuring safe handling of heavy components, and adhering to all safety protocols while working at elevated heights.
申请条件
Candidates must be registered as an apprentice with the Commission de la construction du Québec (CCQ).
Prior experience in wind turbine assembly or construction is preferred.
Ability to work at heights and handle heavy components is essential.
Strong commitment to safety and teamwork is required.
雇主简介
Borea Construction is involved in wind energy projects, specifically the Mesgi'g Ugju's'n 2 Wind Project, focusing on tower erection and component handling.